[1]
Kefyalew, M. 2025. Assessment of the Causes and Effects of Construction Project Delays in Urban Water Supply Project: A Case Study of Kibremengist and Shakkiso Towns. East African Journal of Engineering. 8, 1 (août 2025), 231-244. DOI:https://doi.org/10.37284/eaje.8.1.3433.