Kefyalew, M. (2025). Assessment of the Causes and Effects of Construction Project Delays in Urban Water Supply Project: A Case Study of Kibremengist and Shakkiso Towns. East African Journal of Engineering, 8(1), 231-244. https://doi.org/10.37284/eaje.8.1.3433