Kefyalew, M. (2025) “Assessment of the Causes and Effects of Construction Project Delays in Urban Water Supply Project: A Case Study of Kibremengist and Shakkiso Towns”, East African Journal of Engineering, 8(1), pp. 231-244. doi: 10.37284/eaje.8.1.3433.